Tuesday, November 12, 2013

Tile, siding and trim ~ Oh My!

This weekend was an eventful weekend in the Younker household. We dry-fitted tile. We set a shower pan. We laid tile down. We grouted. And we watched as some guys froze their butts off to hang our siding.

First up. The tile.

A couple weeks ago Ted’s dad, Ted and I put in the backer board in the hall bathroom and the laundry room in preparation for the tile.

IMG_2156
Backer board going in the laundry room a couple weeks ago

This weekend we had a crew in our house to help us with the tile. Ted’s parents, our brother-in-law Chris, and us. This girl isn’t afraid to get her hands dirty. In fact, I love these types of products. It’s a great sense of accomplishment when it’s all over, even though it seems to take forever!!

Ted’s dad dry-fitted the tile in the hall bathroom. And then each tile was labeled so that we knew exactly where that piece of tile went when we mortared it down. I helped him with this part. The bathroom was so little it wasn’t big enough for more than one person so I got the hard job of handing tile to him and mixing more mortar!

IMG_2321       IMG_0491 
Dry-fitting the tile.                                                         The tile is mortared down (you can see our labels)

On Monday, Diane and I had the day off (in observance of Veteran’s Day). Ted (Ted’s dad) is retired so he has every day off. So we came back on Monday and grouted the hall bathroom and laundry room. And wiped it clean.

IMG_2333      IMG_2336
The grout is in. The tile was pretty filmy. I was nervous that the grout was too dark and not the color I wanted. In the second picture you can see how it lightened up and looks great!

The laundry room got the same treatment. Chris and Diane dry-fitted the tile in the laundry room. And then we mortared them down. Ted’s dad and Chris both worked on getting the tile down so it went pretty quickly.

IMG_0490       IMG_2326
Dry-fitted                                              Tile and mortar

IMG_2338
The grout is in!

I love the way it all turned out. I am so grateful for the help we had in this project. Without them we never would have gotten all this done in a weekend. Thank you! Thank you! Thank you!

 

Next up – the master bathroom.

While we were working on the hall bathroom and laundry room, Ted was busy in the master bathroom working on installing the bathtub and pouring the shower pan. Again, we had some help with this project from our good friend Josh.

IMG_0435    
Ted mixing up the…whatever he used… for the shower pan

IMG_0437      IMG_0438
The shower pan is poured! Letting it set before we put the membrane on it

IMG_2339  
My tub is set! I’m so excited to use this thing. It would have come in handy after the weekend working at the house. My muscles were aching!

IMG_2341     IMG_2342
And we got the backer board down on the floor of the master bathroom. We are ready to tile!


Last but not least – the siding. It’s up! And it looks awesome!

You may remember when I mentioned earlier that we went with James Hardie cement board siding in Iron Gray. We love it. The white trim really helps make it pop!

IMG_0426
The areas that do not have siding on them will have stone. Hopefully that will be in the next couple weeks. Hopefully before this Nebraska weather turns too cold.

IMG_0428

IMG_0429

IMG_0431

There is our house. It’s moving along. Each week we get closer to having it all finished! We are crossing our fingers that we’ll be able to move into the house in about 8-10 weeks.

Next on the agenda: tiling the master bathroom, pouring the driveway and patio, and exterior stone. The trim carpenter is suppose to come in the next couple weeks to get started on installing cabinets, trim, install interior doors and work on our closets and locker for the mudroom. Then it’ll start really looking like a house on the inside!

And because she’s too cute not to share, Rainey enjoyed sitting on the porch watching everything going on around her.

IMG_2331

Thursday, October 17, 2013

The house is insulated and drywall is up!

 

So excited to see this process begin and take shape. Now we can definitely feel the size of the rooms and get a real feel for the house’s layout. Ted and I get more and more excited for our home each time we enter it, as it seems like something new occurs every week.

This week was no exception.

This week the drywall began. All that mudding and sanding. Glad it isn’t me doing it…I had my share of that in the old house’s remodeling. Not sure I’m ready to go down that dusty path again so soon.

The deck was also put in this week as well, which wasn’t expected at all. And we got a little surprise on the deck (more on that later).

And now, the tour of our home – the drywall edition.

Main Level

IMG_0395
Laundry Room/mudroom (view from garage)

IMG_0396
Laundry Room/mudroom (view into garage)

IMG_0421
View into laundry/mudroom from kitchen

IMG_0403
Kitchen and dining

IMG_0404
Kitchen, door to laundry/mudroom and stairwell

IMG_0405
Living room and entryway (and Ted)

IMG_0406
Living room/fireplace (and Ted again)

IMG_0407   IMG_0411
Hallways

IMG_0408
Hall bathroom

IMG_0409
Spare room

IMG_0410
Office

IMG_0412
Master bedroom

IMG_0413
Master bedroom

IMG_0414IMG_0415 IMG_0417
Master bathroom

Basement

The basement is insulated and ready for drywall (which will be done after we move in…that is one of our projects to do)

IMG_0418

IMG_0419

Deck

Ted and I got a nice little surprise where the deck is concerned. We originally wanted to do composite decking because … well… it’s awesome. There were just so many pros vs cons for composite decking material over cedar. Then we saw the price tag of composite vs cedar. OUCH. So needless to say we went with the cedar. We figured we’d just stain it and treat it when we needed to in order to make it last a really long time.

Back to that little surprise. Well last night we pulled up to the house and SURPRISE the deck was started (we had no idea that was going to go in so soon). And SURPRISE it wasn’t done in cedar. It was done in composite. After Ted spoke to our builder today, it appears that the lumber yard brought the wrong material. Our builder said “congratulations, you just got a free upgrade”. Woo Hoo! Too bad they didn’t mess up and give us grey instead of red though. Oh well…Beggars can’t be choosers. I will take it.

Our friends Josh and Shawna came over last night to check out the house and to get measurements for flooring (nice to have friends in the field). So they helped us break in the deck with some beers and socializing. It was great! Can’t wait to get a rail up and stairs (another job that Ted and I will be doing after we move in) so that we can do it more often!!

IMG_0402
The deck coming out of the dining area

IMG_0422
The view from the deck

IMG_0420
A backyard view (Either our house is crooked or I was standing crooked when snapping this picture LOL!!)

We are definitely making progress. Rumor is we’ll be seeing the garage/driveway poured soon. As well as stone and siding will be going in and hopefully by the end of the month we’ll have trim and cabinets. Fingers crossed.

Tomorrow our tile that we picked out is being delivered and Ted and I are going to roll up our sleeves and start laying cement board to get ready to tile as soon as we get the okay. And my Master Plumber will be installing the septic tank next week.

So stay tuned…more to come!!

 

I couldn’t resist taking this shot of the sunset out of our front porch. Can’t wait to see this more often!

IMG_0424

Tuesday, October 15, 2013

Dogs approve

It’s been a few weeks since we brought the dogs out to the house. It’s been so muddy, so unfortunately, they had to stay at the apartment. They are a little too wild at the lot house and I knew they’d come home a muddy mess if we took them, so instead of giving them countless baths, we waited to bring them back out. It’s important to us to bring them when we go out so they start getting use to the area and the house.
When we brought them out to the house, it was as if they KNEW it was their house. When I brought them out, Ted was in the basement finishing up some plumbing. And they went crazy in the house! They ran up and down, down and up the stairs. They ran through the studs and all around the house, taking in and smelling everything. It was so fun to watch their excitement. Who needs a dog park when you can just bring them to your new home and they can run their energy out there???
IMG_0359
IMG_0361
IMG_0362
Plumbing is complete. Electrical is in. HVAC is in. The fireplace is installed. So exciting to see the process being completed!!
IMG_0356
Can lights in the living room

IMG_0357

Can light close up

IMG_0365
Kitchen

IMG_0368
Fireplace is in!!

IMG_0370
HVAC is in

IMG_0383
Tub and shower kit is installed in the hall bath

IMG_0384

IMG_0387
IMG_0391
Plumbing for the washer/dryer in the basement
IMG_0386
(future) basement bathroom plumbing
The next step – DRYWALL!! So excited! Can’t wait to see it.