Tuesday, November 12, 2013

Tile, siding and trim ~ Oh My!

This weekend was an eventful weekend in the Younker household. We dry-fitted tile. We set a shower pan. We laid tile down. We grouted. And we watched as some guys froze their butts off to hang our siding.

First up. The tile.

A couple weeks ago Ted’s dad, Ted and I put in the backer board in the hall bathroom and the laundry room in preparation for the tile.

IMG_2156
Backer board going in the laundry room a couple weeks ago

This weekend we had a crew in our house to help us with the tile. Ted’s parents, our brother-in-law Chris, and us. This girl isn’t afraid to get her hands dirty. In fact, I love these types of products. It’s a great sense of accomplishment when it’s all over, even though it seems to take forever!!

Ted’s dad dry-fitted the tile in the hall bathroom. And then each tile was labeled so that we knew exactly where that piece of tile went when we mortared it down. I helped him with this part. The bathroom was so little it wasn’t big enough for more than one person so I got the hard job of handing tile to him and mixing more mortar!

IMG_2321       IMG_0491 
Dry-fitting the tile.                                                         The tile is mortared down (you can see our labels)

On Monday, Diane and I had the day off (in observance of Veteran’s Day). Ted (Ted’s dad) is retired so he has every day off. So we came back on Monday and grouted the hall bathroom and laundry room. And wiped it clean.

IMG_2333      IMG_2336
The grout is in. The tile was pretty filmy. I was nervous that the grout was too dark and not the color I wanted. In the second picture you can see how it lightened up and looks great!

The laundry room got the same treatment. Chris and Diane dry-fitted the tile in the laundry room. And then we mortared them down. Ted’s dad and Chris both worked on getting the tile down so it went pretty quickly.

IMG_0490       IMG_2326
Dry-fitted                                              Tile and mortar

IMG_2338
The grout is in!

I love the way it all turned out. I am so grateful for the help we had in this project. Without them we never would have gotten all this done in a weekend. Thank you! Thank you! Thank you!

 

Next up – the master bathroom.

While we were working on the hall bathroom and laundry room, Ted was busy in the master bathroom working on installing the bathtub and pouring the shower pan. Again, we had some help with this project from our good friend Josh.

IMG_0435    
Ted mixing up the…whatever he used… for the shower pan

IMG_0437      IMG_0438
The shower pan is poured! Letting it set before we put the membrane on it

IMG_2339  
My tub is set! I’m so excited to use this thing. It would have come in handy after the weekend working at the house. My muscles were aching!

IMG_2341     IMG_2342
And we got the backer board down on the floor of the master bathroom. We are ready to tile!


Last but not least – the siding. It’s up! And it looks awesome!

You may remember when I mentioned earlier that we went with James Hardie cement board siding in Iron Gray. We love it. The white trim really helps make it pop!

IMG_0426
The areas that do not have siding on them will have stone. Hopefully that will be in the next couple weeks. Hopefully before this Nebraska weather turns too cold.

IMG_0428

IMG_0429

IMG_0431

There is our house. It’s moving along. Each week we get closer to having it all finished! We are crossing our fingers that we’ll be able to move into the house in about 8-10 weeks.

Next on the agenda: tiling the master bathroom, pouring the driveway and patio, and exterior stone. The trim carpenter is suppose to come in the next couple weeks to get started on installing cabinets, trim, install interior doors and work on our closets and locker for the mudroom. Then it’ll start really looking like a house on the inside!

And because she’s too cute not to share, Rainey enjoyed sitting on the porch watching everything going on around her.

IMG_2331

The tank is in!

The septic tank that is. I know, I know. It’s a septic tank. It’s not glamorous at all. But it’s part of the house building process.

And when your hubby digs and installs it, it is pretty exciting! I’m so thankful my husband knows how to do these things. And that our builder allows us to do these things on our own in a way to save some money. And it is a way for us to make this house a part of us; because our blood, sweat and tears are going into the building process.

Installing a septic tank is easy peasy, right?!?


Wrong!

I had NO idea what went into installing a septic tank. I honestly thought you dug a hole and set a tank in said hole and ran a pipe or two from the house to the tank. Ha! Needless to say, I will just stick to my day job and leave this stuff to the professional.

So without further ado, there is my hubby hard at work!

IMG_2182
That’s my husband….in the backhoe. And that’s my back yard…completely torn up!

IMG_2183


IMG_2185   IMG_2186
There is another shot of Ted hard at work. The person crouched down is Matt, Ted’s helper. And a picture of how far the pipes are coming from the house. You can barely see it, but the septic tank is the orange thing closer to the house (in the hole of course)


IMG_2213    IMG_2215
                          The septic tank. Fun isn’t it!?!

IMG_2210
More trenches dug by the hubs!


The hubs also dug in our garage drain. More exciting stuff, I know, but it’s progress none the less. And progress makes me happy!!


IMG_2206



IMG_2208

So blessed to have a husband that does this. And doesn’t mind my questions about this, that and everything in between!

Next up – tile!!

Thursday, August 8, 2013

Pipes are in!

July 20, 2013 - Ted, Ted Sr, Matt (Ted’s helper at work) and Matt’s brother were all working hard on the plumbing at the house. Thank goodness for plumbers in the family (and friends). And thank goodness for the amazing weather that day! It was 82 degrees, cloudy and a nice cool breeze. Perfect.

Leupold Image
The pans were still there when Ted and the guys got out there. Apparently the crane used to remove them broke the day before so it was up to them to move them themselves.


Basement  walls water proofed





Ted doing his thing in the back-hoe


I can only imagine what they were talking (bickering) about :)

Getting those pans out

Teamwork

Leupold Image
All the pans are gone (the company was able to come pick them all up after all that hard work by the guys)

Lot 12-1
Laying some pipes

Lot 12-2
The dogs had to come, of course. Taking a break under the truck.

Lot 12-3
Pipes are in!

Lot 12-4
Working hard!!

Lot 12-5
Dad supervising son

Lot 12-6
More supervising (he really did help out alot..just have to give him a hard time :) )


Next up - Plumbing inspection, pouring the basement floor and digging the well!!
Sadly, the rain has been holding us up so we are a few weeks behind schedule. BUT MK told us that the basement was poured this week (August 6-8th) and that framing should be starting in 2-3 weeks. Can't wait!!!!