Showing posts with label Rosco. Show all posts
Showing posts with label Rosco. Show all posts

Tuesday, October 15, 2013

Dogs approve

It’s been a few weeks since we brought the dogs out to the house. It’s been so muddy, so unfortunately, they had to stay at the apartment. They are a little too wild at the lot house and I knew they’d come home a muddy mess if we took them, so instead of giving them countless baths, we waited to bring them back out. It’s important to us to bring them when we go out so they start getting use to the area and the house.
When we brought them out to the house, it was as if they KNEW it was their house. When I brought them out, Ted was in the basement finishing up some plumbing. And they went crazy in the house! They ran up and down, down and up the stairs. They ran through the studs and all around the house, taking in and smelling everything. It was so fun to watch their excitement. Who needs a dog park when you can just bring them to your new home and they can run their energy out there???
IMG_0359
IMG_0361
IMG_0362
Plumbing is complete. Electrical is in. HVAC is in. The fireplace is installed. So exciting to see the process being completed!!
IMG_0356
Can lights in the living room

IMG_0357

Can light close up

IMG_0365
Kitchen

IMG_0368
Fireplace is in!!

IMG_0370
HVAC is in

IMG_0383
Tub and shower kit is installed in the hall bath

IMG_0384

IMG_0387
IMG_0391
Plumbing for the washer/dryer in the basement
IMG_0386
(future) basement bathroom plumbing
The next step – DRYWALL!! So excited! Can’t wait to see it.

Thursday, August 8, 2013

Pipes are in!

July 20, 2013 - Ted, Ted Sr, Matt (Ted’s helper at work) and Matt’s brother were all working hard on the plumbing at the house. Thank goodness for plumbers in the family (and friends). And thank goodness for the amazing weather that day! It was 82 degrees, cloudy and a nice cool breeze. Perfect.

Leupold Image
The pans were still there when Ted and the guys got out there. Apparently the crane used to remove them broke the day before so it was up to them to move them themselves.


Basement  walls water proofed





Ted doing his thing in the back-hoe


I can only imagine what they were talking (bickering) about :)

Getting those pans out

Teamwork

Leupold Image
All the pans are gone (the company was able to come pick them all up after all that hard work by the guys)

Lot 12-1
Laying some pipes

Lot 12-2
The dogs had to come, of course. Taking a break under the truck.

Lot 12-3
Pipes are in!

Lot 12-4
Working hard!!

Lot 12-5
Dad supervising son

Lot 12-6
More supervising (he really did help out alot..just have to give him a hard time :) )


Next up - Plumbing inspection, pouring the basement floor and digging the well!!
Sadly, the rain has been holding us up so we are a few weeks behind schedule. BUT MK told us that the basement was poured this week (August 6-8th) and that framing should be starting in 2-3 weeks. Can't wait!!!!

Sunday, July 21, 2013

The building process begins!

 
Ted and I always wanted to build our next home. It’s always been our dream. However, we never thought that dream would be attainable because we didn’t think we’d be able to afford it. At least not right now. We figured it would be something we’d be able to do in 10+ years. We had already been pre-approved for a mortgage loan, so we knew where our maximum price point was. We just never believed we’d be able to build a home for that same price. We were wrong! :)
We began speaking to our builder, MK Builders Inc. Ted’s company is actually a sub-contractor for MK, so Ted knew their work ethic and quality of homes they built. We spoke to a few other builders at our local Home and Garden Show. We knew we’d be building with MK, but it was still nice to get some ideas from other local builders. Matt from MK made us feel welcomed and he was very informative on the process as well as answered all of our questions and concerns. I had a lot of fears of building, mostly “how in the heck are we going to afford this” so having Matt explain everything was extremely helpful.
Our journey with building began in February 2013. Ted and I had decided to put our home on the market so that we could start the process of building our new home. Much to our excitement, and shock, we sold our home eight days after we put the sign in the yard! We listed our house February 14, 2013, (romantic right?) and accepted an offer February 22nd. We were to close on our house March 29th (ironically, we closed on that house March 27, 2009 and moved the last item out of that house March 27, 2013).
Dunn home Our house on Dunn (Rainey is in her favorite spot in that house – by the front door
checking out the neighborhood).
 
 
We began our search for our next home looking on the internet for homes for sale. Mostly what we found were houses that needed way to much work for way to much money. It was frustrating. So we decided to look into building after we talked to our realtor, Laura, who happens to be Matt’s wife.
MK told us to look at a local drafting company’s website for floor plans. We found eight floor plans that we liked. So one night we sat down and went over all of them and narrowed them down to our top three choices. Talk about a tough decision!! We liked them all, there were aspects of each one that we loved. With the remaining three, we listed the pro’s and con’s of each design. We sat and discussed those three choices and agreed on our number one choice. We had found a winner!
house7
 
 
March 15, 2013 we went and looked at a little Australian Shepherd puppy named Jaeger. He was a black tri and was ready to go to his forever home. Ted and I fell in love with him right away, especially because he kept leaving his siblings to come and cuddle with us. We left him with his siblings that night and came back to pick him up the following morning. That was the day Rosco came into our lives.
 
             Rosco rosco2
                Isn’t he cute?!?!?!
March 23, 2013, Ted and I began moving into our apartment. We ended up getting a one bedroom apartment at a pet friendly community. It was a big down-grade from our three bedroom house, but we figured it was only temporary. It definitely feels like the walls are closing in at times, but we are making do just fine.
March 26, 2013 we took the plan to MK and told Matt what changes we wanted. Straighten the garage, extend the laundry room so that we could include a mud room as well, move the pantry to the corner of the kitchen to make a walk-in pantry, and extend the shower in the master bathroom to make it a walk-in shower. Everything else stayed the same. I just LOVE this house plan.
The bidding process took a lot longer than we hoped it would have. It was suppose to take two weeks but because of the Lincoln Parade of Homes, it took six! And when we received the bid for our home, it was WAY over our budget. It was frightening…I wanted to walk away from building all together after hearing that figure and go back to looking for a house to buy.
Ted and I went over our proposal and found areas to cut out or reduce the allowances in order to get the bid to where we needed it. Luckily, with the sweat equity we plan on putting into the house, and the down payment, we were going to be okay. So we started getting the house plan and contract finalized.
Luckily for us, finding a lot was easy. MK actually owned the perfect lot in Weindelin Estates near Blue Stem Lake. We looked at a few other lots, but they quickly sold, so we decided that the lot MK owned was the best one for our needs, so we decided to purchase it from them. Since MK owned the lot, once we gave them the money down, the permits began to get pulled and the work began.
We staked and roped off the area where the house would sit the last week of June. Then we just had to wait for all the permits to come in. While we waited, we worked with Taylor at Union Bank for our construction loan. We were approved and went signed our lives away for the construction loan on July 9, 2013. That same day we made our first draw for the lot and was the day we officially broke ground! It was great to have everything finally start!
Leupold Image Our lot view from the creek
Lot 2Our lot view looking towards the creek
 
 
 
Highlights:
  • February 14, 2013 – house on Dunn put on the market
  • February 22, 2013 – offer accepted on Dunn house
  • March 29, 2013 – closed on Dunn house
  • March 26, 2013 – began process with MK Builders
  • June 26, 2013 – staked and roped off are where future home will sit on lot