Basement floor is poured!

August 8, 2013 – the concrete contractors came out and filled our basement floor! MK didn’t tell us that this was going to be done, so when we happened to drive out there Friday, the 9th, we were pleasantly surprised, to say the least!

Leupold Image

Leupold Image

Leupold Image

Leupold Image

Leupold Image

Leupold Image

Leupold Image

Our storm shelter:IMG_0203

Basement is poured!!! They cut lines into the concrete, that way as the foundation settles, it doesn’t let the concrete crack as badly as it would without the lines (Ted had to tell me this…obviously I have NO idea)IMG_0204

It looks so big!!!!IMG_0205

IMG_0206

IMG_0207

Trying to get a picture like this every time so we can see the progress as the house takes shape.IMG_0208

I’m going to try and take a picture from this angle every time we go out…so at the end we can compare the difference made. IMG_0210

Back-filling the foundation

August 1, 2013 – the sub-contractors came out and back-filled  the foundation. We’re getting closer and closer to framing. We can’t wait!!

Since we weren’t out there when this was going on, we had to rely on the trail camera’s picture to capture this process. Here they are:

Leupold Image

Leupold Image

Leupold Image

Leupold Image

Leupold Image

Ted and I stopped out to see the progress and excited to see the house coming together. IMG_0202

We were really excited to see that we now have power set up at the lot! It’s temporarily set up at the moment, but soon it will be up and live! IMG_0198

Thursday, August 8, 2013

Pipes are in!

July 20, 2013 - Ted, Ted Sr, Matt (Ted’s helper at work) and Matt’s brother were all working hard on the plumbing at the house. Thank goodness for plumbers in the family (and friends). And thank goodness for the amazing weather that day! It was 82 degrees, cloudy and a nice cool breeze. Perfect.

Leupold Image
The pans were still there when Ted and the guys got out there. Apparently the crane used to remove them broke the day before so it was up to them to move them themselves.


Basement  walls water proofed





Ted doing his thing in the back-hoe


I can only imagine what they were talking (bickering) about :)

Getting those pans out

Teamwork

Leupold Image
All the pans are gone (the company was able to come pick them all up after all that hard work by the guys)

Lot 12-1
Laying some pipes

Lot 12-2
The dogs had to come, of course. Taking a break under the truck.

Lot 12-3
Pipes are in!

Lot 12-4
Working hard!!

Lot 12-5
Dad supervising son

Lot 12-6
More supervising (he really did help out alot..just have to give him a hard time :) )


Next up - Plumbing inspection, pouring the basement floor and digging the well!!
Sadly, the rain has been holding us up so we are a few weeks behind schedule. BUT MK told us that the basement was poured this week (August 6-8th) and that framing should be starting in 2-3 weeks. Can't wait!!!!

Sunday, August 4, 2013

Basement walls are poured!!!!


July 15-18, 2013 – pans were set up and walls are poured.
 
Leupold Image
Wall pans are being delivered!
Leupold Image
Pans are here!
Leupold Image
Pans being set up!
Leupold Image
Walls are poured!
Leupold Image
Pans are taken down!
Lot 4-3
Walls are coated with a water barrier!

Lot 4-4
Our storm shelter
 
Lot 4-6
Walls are all done!
 
Lot 4-7

Lot 4-23
North side of garage
 
Lot 4-24
Rosco checking it all out!

Since the walls are poured that means we are ready for the next step –
Ted’s plumbing skills :)