Sunday, August 11, 2013

Basement floor is poured!

August 8, 2013 – the concrete contractors came out and filled our basement floor! MK didn’t tell us that this was going to be done, so when we happened to drive out there Friday, the 9th, we were pleasantly surprised, to say the least!

Leupold Image

Leupold Image

Leupold Image

Leupold Image

Leupold Image

Leupold Image

Leupold Image

Our storm shelter:IMG_0203

Basement is poured!!! They cut lines into the concrete, that way as the foundation settles, it doesn’t let the concrete crack as badly as it would without the lines (Ted had to tell me this…obviously I have NO idea)IMG_0204

It looks so big!!!!IMG_0205

IMG_0206

IMG_0207

Trying to get a picture like this every time so we can see the progress as the house takes shape.IMG_0208

I’m going to try and take a picture from this angle every time we go out…so at the end we can compare the difference made. IMG_0210